EasyManua.ls Logo

Huawei SmartLi 3.0 - Battery Test; Communication Involved; Performing a Shallow Discharge Test

Huawei SmartLi 3.0
171 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Check Item Acceptance Criteria Check Method and
Troubleshooting
Check Interval
6 Group
capacity test
(recommende
d)
During the group capacity
test, no fault or alarm is
displayed on the UPS and
SmartLi LCDs.
Check method: Perform
a group capacity test by
referring to 7.2.1.3
Performing a Group
Capacity Test and
check the alarm
information on the UPS
and SmartLi LCDs.
Troubleshooting: View
the alarm information
on the UPS and SmartLi
LCDs and handle the
alarm.
Annually
7.2 Battery Test
Perform the following steps on the UPS LCD.
7.2.1 Communication Involved
Currently, a shallow discharge test and a capacity test can be performed only for
the UPS5000-E, UPS5000-S, and UPS5000-H. A group capacity test can be
performed only for the UPS5000-H.
7.2.1.1 Performing a Shallow Discharge Test
This item allows you to partially discharge batteries. A shallow discharge test is
conducted to test the battery loop reliability and short-time discharge capacity
when the batteries have not been discharged for a long time.
Automatic Shallow Discharge Test
NO TICE
Before the test, ensure that:
The UPS is working in normal mode; oat charging has lasted for 2 hours after
the SOC reaches 100%; the load rate uctuation is less than 10%.
The UPS generates no battery overtemperature, overvoltage, or overcurrent
alarm. No generator is connected to the UPS.
The mains, batteries, charger, and discharger are normal. No overload alarm is
generated.
The SmartLi generates no alarms related to lithium batteries.
SmartLi 3.0
User Manual (Short-Term Backup Power) 7 Maintenance
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 142

Table of Contents

Related product manuals