5.3 Transportation, Unpacking, and Checking
● To prevent the equipment from falling over, secure it to a pallet truck using
ropes before moving it. Move the equipment with caution to avoid bumping or
falling, which may damage the equipment.
● After placing the equipment in the installation position, unpack it and take care
to prevent scratches. Keep the equipment stable during unpacking.
● Before unpacking batteries, check whether the packaging is intact. Do not use
batteries with damaged packaging. If any damage is found, notify the carrier
and manufacturer immediately.
● After unpacking, check whether the fastening components and removable
components are loose. If they are loose, notify the carrier and manufacturer
immediately.
● If the installation environment is poor, take dustproof measures (for example,
use a dust cover) after unpacking to prevent equipment damage due to dust
buildup inside it.
● If the installation environment is poor, take anti-condensation measures after
unpacking and keep the air conditioner running. Do not store the equipment in
an environment where the temperature and humidity are uncontrollable for a
long period of time. Otherwise, the equipment may be damaged due to
condensation.
Step 1 Use a pallet truck to transport the cabinet to the installation position.
Step 2 Remove the packing case and dust cover. Keep the dust cover, accessories, and
marking-o template aside.
Step 3 Check that the cabinet is intact.
1. Visually inspect the cabinet appearance for damage caused during
transportation. If any damage is founded, take photos and contact the carrier.
2. Check that all ttings comply with the packing list. If there is any discrepancy,
keep a record and contact the supplier immediately.
Table 5-4 List of accessories
Appearance
Name Quantity (PCS)
M16 bolt assembly 3
M12x30 screw
assembly
1
SmartLi 3.0
User Manual (Short-Term Backup Power) 5 Installation and Cable Connection
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 62