7.2.1.3 Performing a Group Capacity Test
Context
If multiple SmartLi cabinets are connected in parallel, discharge each SmartLi one
by one. (When a SmartLi is fully discharged, charge the SmartLi until its SOC
reaches 100%, and then discharge the next SmartLi until all SmartLi cabinets are
fully discharged.) A deep discharge test is conducted to obtain the battery
discharge performance data.
NO TICE
Before performing a capacity test, ensure that:
The active power of the UPS is greater than 20 kW.
(Total power of SmartLi cabinets in the system – Power of a single SmartLi) >
UPS active power x 110%.
The UPS is working in normal mode; oat charging has lasted for 5 minutes
after the SOC of batteries reaches 100%; the load uctuation of the system is
less than 20%.
The UPS generates no battery overtemperature, overvoltage, or overcurrent
alarm. No generator is connected to the UPS.
The mains, batteries, charger, and discharger are normal. No overload alarm is
generated.
The SmartLi generates no alarms related to lithium batteries.
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Group Capacity Test to start a group capacity test.
Figure 7-3 Starting a group capacity test
SmartLi 3.0
User Manual (Short-Term Backup Power) 7 Maintenance
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 145