5 Installation and Cable Connection
D ANGER
Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
5.1 Installation Clearances
Reserve the following clearances around the cabinet to facilitate operations and
ventilation:
Reserve at least 850 mm from the front of the cabinet.
Reserve at least 500 mm from the top of the cabinet.
The device can be installed against a wall and no space needs to be reserved
at the rear.
Figure 5-1 Reserved clearances (unit: mm)
SmartLi 3.0
User Manual (Short-Term Backup Power) 5 Installation and Cable Connection
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 53