6.1.3 Power Cable Selection
Figure 6-2 UPS copper bar layout and
specications (unit: mm)
(1) Battery wiring busbar (2) Mains input wiring busbar (3) Bypass input wiring busbar
(4) Output wiring busbar (5) PE wiring busbar
If multiple UPSs are connected in parallel, input and output power cables as well
as copper bars for each UPS should have the same length and
specications.
The cables need to be selected according to the site survey data. The cable
recommendation is for your reference.
Table 6-2 Recommended cross-sectional areas for power cables
Item
400 kVA 500 kVA 600 kVA
Mains input Mains input current
(A)
743 929 1115
Recommende
d cross-
sectional area
(mm
2
)
L1 2 x (4 x
240)
3 x (4 x
240)
4 x (4 x
185)
L2
L3
UPS5000-H-(400 kVA-600 kVA)
User Manual (100 kVA Power Module) 6 Installation