6.3.2 Installing Cabinet Cables
Context
The number and colors of cables in the gures are for reference only.
Procedure
Step 1 Open the front door of the cabinet, remove the power distribution cover, and
remove the top cover as required.
Figure 6-7 Removing the covers
Step 2 Install ground cables.
UPS5000-H-(400 kVA-600 kVA)
User Manual (100 kVA Power Module) 6 Installation
Issue 01 (2020-11-30) Copyright © Huawei Technologies Co., Ltd. 60