(4) Flat washer (5) Nut
● Two power sources
Figure 6-10 Installing cables
(1) Wiring terminal (2) Spring washer (3) Bolt
(4) Flat washer (5) Nut
Step 4 Connect signal cables. Bind cables to the cabinet nearby.
● If you need to log in to the WebUI of the UPS monitoring system, connect the
network port on a PC to the FE port on the monitoring interface card.
● If the UPS needs to connect to an external network management device,
connect the external network management device to the RS485 port on the
monitoring interface card.
● Do not bind signal cables and power cables together.
● RS485 cables and FE cables must be shielded cables.
UPS5000-H-(400 kVA-600 kVA)
User Manual (100 kVA Power Module) 6 Installation
Issue 01 (2020-11-30) Copyright © Huawei Technologies Co., Ltd. 62