Use a Phillips screwdriver to x the mounting ears to both sides of the chassis
with M4 screws. For details about how to install the mounting ears, see the
installation methods in Figure 5-38.
Figure 5-38 Installation of front and rear mounting ears
Step 2 Install
oating nuts and cabinet guide rails.
1. Determine the positions for installing the guide rails and oating nuts, as
shown in Figure 5-39.
Install the two guide rails at the same height to ensure that the device is
level.
Figure 5-39 Positions of oating nuts
2. Install the oating nuts that match M6 screws at the positions marked in
Figure 5-39. Figure 5-40 illustrates how to install a oating nut.
HUAWEI USG6000E Series
Hardware Guide 5 Hardware Installation
Issue 08 (2022-04-20) Copyright © Huawei Technologies Co., Ltd. 564