EasyManua.ls Logo

Huawei USG6000E Series - Page 585

Huawei USG6000E Series
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Context
Before you power on the USG, ensure that:
The power cable and PGND cable are properly connected.
The power switch in the equipment room is easy to locate so that you can
power
o devices in the case of accidents.
Procedure
Power on the USG.
Turn on the switch of the power supply device. The USG starts.
You can identify the USG status based on indicators on the front and rear
panels. Indicators shown in USGFigure 5-51 indicate that the USG runs
normally.
Figure 5-51 Indicators when the USG runs normally
Power o the USG.
NO TICE
Before powering o the USG, ensure that conguration data is saved.
Otherwise, the
conguration data may be lost.
If the USG will be administratively shut down for a long time, turn o the
power switch. After powering
o the USG, set it aside properly according to
storage requirements.
HUAWEI USG6000E Series
Hardware Guide 5 Hardware Installation
Issue 08 (2022-04-20) Copyright © Huawei Technologies Co., Ltd. 578

Table of Contents

Other manuals for Huawei USG6000E Series

Related product manuals