EasyManua.ls Logo

Huawei V100R006C00 - 6.2 Configuring the Information Center

Huawei V100R006C00
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.2.1 Establishing the Configuration Task
Applicable Environment
To collect debugging information, logs, and traps during the operation of the S5700, and to send
them to the terminal for display, or to the buffer or the host for storage, you need to configure
the information center.
Pre-configuration Tasks
None.
Data Preparation
To manage the information center, you need the following data.
No. Data
1 (Optional) Numbers and names of the information channels
2 (Optional) Format of the timestamp
3 (Optional) Information severity
4 (Optional) Language used in the logs and the address of the log host
5 (Optional) Size of the log buffer and the trap buffer
6.2.2 Enabling the Information Center
Context
Do as follows on the S5700.
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
info-center enable
The information center view is displayed.
NOTE
The system sends the system information to the log host and the console only after the information center
is enabled.
----End
Quidway S5700 Series Ethernet Switches
Configuration Guide - Device Management 6 Monitoring the Device Through the Information Center
Issue 01 (2011-07-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
55

Table of Contents

Related product manuals