EasyManua.ls Logo

IBM 3500 - Page 95

IBM 3500
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 66. Fully inserted latch into the rack slots
3. Mount the 5149-N64 switch.
a) Slide the switch into the channel on the rack rails. Push the switch until you hear the locking
mechanism click on both sides.
Figure 67. Sliding the switch into the channel
b) Tighten the two captive screws at the front of the mounted switch.
Figure 68. Tightening the two captive screws
Note: Unused OSFP cages must be closed with dust caps that are supplied with the system.
Conguration and cabling
For more information about switch setup and conguration, see the QM9700/QM9790 1U NDR 400Gb/s
InniBand Switch Systems User Manual.
Appendix C. The 5149-N64 switch
79

Table of Contents

Related product manuals