EasyManua.ls Logo

IBM 7026-H80 - RS/6000 - 256 MB RAM - Page 156

IBM 7026-H80 - RS/6000 - 256 MB RAM
557 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The following table outlines the IPL phases from power-on to the AIX login prompt,
matching the phases to corresponding operator-panel checkpoints for a typical system
boot. Also listed are the approximate boot times for each phase, along with their
dependencies for each phase.
Note: The table below lists the major checkpoints only.
Phase # Checkpoints on
Operator Panel
Time in phase
(minutes)
Major contributors to time in phase
Phase 1 8xxx => OK Approx. 1
Phase 2 9xxx => 91FF 3 to 6 Number of I/O drawers
Phase 3 Exxx => E105 1 to 3 Number of bootable adapters
Phase 4 0xxx => blank 2 to 30+ Number of SSA drives
Number of SCSI drives
Number of Async sessions
Number of processors
Number of adapters
Amount of memory
138 Service Guide

Table of Contents

Related product manuals