EasyManua.ls Logo

IBM 7026-H80 - RS/6000 - 256 MB RAM - Page 175

IBM 7026-H80 - RS/6000 - 256 MB RAM
557 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 2. Firmware Checkpoints (continued)
Checkpoint Description Action/
Possible Failing FRU
E604 SSA PCI adapter BIST and
subsequent POSTs have completed
successfully.
Replace the adapter. See
“Checkpoint and Error Code Index”
on page 165 for location code
information related to this error.
E605 SSA PCI adapter BIST has
completed successfully but the
subsequent POSTs have failed.
Replace the adapter. See
“Checkpoint and Error Code Index”
on page 165 for location code
information related to this error.
E60E SSA PCI adapter open firmware
about to exit (no stack corruption).
Replace the adapter. See
“Checkpoint and Error Code Index”
on page 165 for location code
information related to this error.
E60F SSA PCI adapter open firmware
has run unsuccessfully.
Replace the adapter. See
“Checkpoint and Error Code Index”
on page 165 for location code
information related to this error.
E6FF SSA PCI adapter open firmware
about to exit (with stack corruption).
Replace the adapter. See
“Checkpoint and Error Code Index”
on page 165 for location code
information related to this error.
E700 Create system firmware VPD Replace the primary I/O drawer
backplane, location: U0.1–P1.
E701 Create memory VPD. Go to “MAP 1540: Minimum
Configuration” on page 113 to
isolate the failing memory
components.
E702 Create processor card VPD. Replace the processor card,
location: U1.1–P1–C1. See the
note on page 139.
E703 Create operator panel VPD.
1. Replace the operator panel,
location U0.1–L1. See
“Replacing the Primary Drawer
Operator Panel” on page 163.
2. Replace the primary I/O drawer
backplane, location: U0.1–P1.
E704 Create CEC VPD. See the note on page 139.
E705 Create clock card VPD. See the note on page 139.
E706 Create RIO extender card VPD. Replace RIO extender card. See
the note on page 139.
E707 Create system VPD. See the note on page 139.
E708 Create RIO to PCI adapter VPD. See the note on page 139.
E709 Create VPD via SPCN. See the note on page 139.
E70A Create service processor VPD. Replace the primary I/O drawer
backplane, location: U0.1–P1.
Chapter 4. Checkpoints
157

Table of Contents

Related product manuals