A20733 B0 113
Adjustment and replacement procedures
FINAL OPERATIONS
11- Tighten the two cannon holder lock screws without forcing them.
12- Stop the jet. Clean the head and reconnect the resonator leads. Replace the protective cover.
Close the head cover.
13- Start the jet and re-enable the "Recup. fault" check.
14- Check the break-off point and adjust if necessary.
15- Clear any faults. Perform continuous printing tests.
Check that the electrodes and gutter are clean after printing for 10 minutes.