3.8 FAN SPEED CALIBRATION
Verication and calibration are necessary, in the case of transformation to other types of gas, in the extraordinary maintenance
phase with replacement of the PCB, air/gas circuit components or in the case of installations with ue extraction systems, with
horizontal concentric pipe measuring more than 1 metre.
e appliance’s heat output is correlated to the length of the air intake and ue exhaust pipes.
is decreases with the increase of pipe length.
e appliance leaves the factory adjusted for minimum pipe length (1m coaxial).
- Activate ue test (Par. 3.15);
- Detect the ue signal ∆P (Ref. 13 and 14, Fig. 53);
- When replacing the P.C.B. or adapting to another type of gas, set parameters "S0" and "S2" as indicated in the table in the paragraph
"3.11 P.C.B. programming" and parameter "S1" as indicated in the table below.
- When replacing the P.C.B. or adapting to another type of gas, set the heating output (parameter "P2") as shown in the table in the para-
graph "3.11 P.C.B. programming".
Victrix Tera V2 24 Plus EU
∆P<153 Pa ∆P≥153 Pa ∆P≥215 Pa
G20 (x50 = RPM) S1 = 118 S1 = 121 S1 = 128
G31 (x50 = RPM) S1 = 118 S1 = 121 S1 = 128
Victrix Tera V2 35 Plus EU
∆P<295 Pa ∆P≥295 Pa ∆P≥383 Pa
G20 (x50 = RPM) S1 = 120 S1 = 123 S1 = 130
G31 (x50 = RPM) S1 = 120 S1 = 123 S1 = 130
Victrix Tera V2 24 Plus EU (C
(10)
- C
(12)
)
∆P< 278 Pa ∆P≥ 278 Pa
G20 (x50 = RPM)
S0 = 46
S1 = 125 S1 = 128
S2 = 50
Victrix Tera V2 35 Plus EU (C
(10)
- C
(12)
)
∆P< 415 Pa ∆P≥ 415 Pa
G20 (x50 = RPM)
S0 = 58
S1 = 128 S1 = 130
S2 = 56