EasyManua.ls Logo

Inxpect SRE 200 Series - Page 66

Inxpect SRE 200 Series
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
Inxpect SRE 200 Series| Instruction manual v1.5 DEC 2023 |Inxpect SAF-IM-200S_5m_7_00047_en_v1.5|© 2021-2023 Inxpect SpA
8. Installation and use procedures
8.2.2 Install the control unit
WARNING! To prevent tampering, make sure the control unit is only accessible to authorized
personnel (e.g., key-locked electrical panel)
1. Mount the control unit on the DIN rail.
2. Make electrical connections (see "Terminal blocks and connector pin-outs" on page109 and "Electrical
connections" on page111).
NOTICE: if at least one input is connected, the SNS input "V+ (SNS)" and the GND input "V- (SNS)" must also be
connected.
NOTICE: when powered, the system takes about 20 s to start.During that period, the outputs and the diagnostic
functions are deactivated, and the green sensor status LEDs of the connected sensors in the control unitflash.
NOTICE: make sure to avoid any EMC interference during the control unit installation.
Note: to correctly connect the digital inputs, see "Voltage and current limits for digital inputs" on page110.

Table of Contents