EasyManua.ls Logo

Johnson Controls FRICK QUANTUM HD - Page 49

Johnson Controls FRICK QUANTUM HD
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
QUANTUM™ HD COMPRESSOR CONTROL PANEL
OPERATION
090.040-O (MAR 12)
Page 49
High Stage/Booster
The
High Stage System Link setpoint is provided
to tie a system of Booster compressors to a sys-
tem of High Stage compressors. For example, if
the Booster compressors are setup on System
#1 and the High Stage Compressors are on Sys-
tem #2, the High Stage System Link setpoint
from System #1 would be set as System 2.
When the Booster System’s leader wants to
start the rst Booster compressor, it rst checks
that a Booster compressor is available to run
and then sends a signal to the High Stage
System’s leader telling it to start a High Stage
compres-sor. If all the High Stage compressors
are off, the High Stage System’s leader will
start its rst compressor, regardless of what the
High Stage Control Input is reading. When the
Booster System’s leader observes that a High
Stage compressor is running, it will allow a
Booster compressor to start.
After the
rst High Stage compressor begins to
run, compressors in both systems will cycle on
and off as their Control Inputs move up and
down. The only stipulation to the control strat-
egy is that one High Stage compressor must al-
ways remain on as long as at least one Booster
compressor is running. If all the Booster com-
pressors turn off, the High Stage compressor
can then turn off as well.
This concludes the Sequencing setup.

Table of Contents

Other manuals for Johnson Controls FRICK QUANTUM HD

Related product manuals