KAESER M 64 - Putting the Generator into Operation; Fig. 22 Insulation Monitoring - 400 V Three-Phase Generator; Fig. 23 Insulation Monitoring - 230 V Three-Phase Generator; Tab. 69 Low-Temperature Equipment Checklist

KAESER M 64
344 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To be checked see chapter Confirmed?
Close the tap on the frost protector. 8.6
Tab. 69 Low-temperature equipment checklist
7.5 Option ga
Putting the generator into operation
The generator can be operated without earthing.
Test the insulation monitoring daily with the motor running before putting the generator into opera‐
tion.
Fig. 22 Insulation monitoring – 400 V three-phase Generator
Fig. 23 Insulation monitoring – 230 V three-phase Generator
1 «Main switch»
2 «Operating mode selector switch»
3 Test button with
earth leak
warning lamp
for «insulation monitoring»
4
«Mains circuit breaker»
(«Circuit breaker»
designed as automatic
circuit-breaker with shunt trip)
5
Three-phase power sockets
6 Single-phase power sockets
7 Initial Start-up
7.5 Putting the generator into operation
66
Operator manual Portable compressor
M 64 No.: 9_5898 26 E