EasyManua.ls Logo

Keithley 2010

Keithley 2010
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M
Main CPU firmware replacement 5-7
Manufacturing calibration 2-20
Manufacturing calibration commands B-14
Measuring synthesizer signal amplitude 2-24
Memory circuits 4-7
Microcontroller 4-6
Microprocessor 4-6
Miscellaneous calibration commands B-4
Motherboard removal 5-5
Multiplexer and A/D converter 4-9
N
No comm link error 4-18
O
Ordering information 6-2
P
Parts lists 6-2
Performance Verification 1-1
Performing the verification test procedures 1-5
Power module removal 5-8
Power supply 4-4
Power supply checks 4-11
Power transformer removal 5-8
Power-on self-test 4-2
Preparing the Model 2010 for calibration 2-6,
2-14
Principles of operation 4-4
Programming calibration dates 2-19
R
Recommended equipment 2-5
Recommended test equipment 1-3, 2-20
Remote calibration 2-13
Remote command code 2-4
Remote error reporting B-14
Remote manufacturing calibration (firmware
A13 and lower) 2-25
Remote manufacturing calibration (firmware
A14 and higher) 2-23
Removing power components 5-8
Repair considerations 4-2
Replaceable Parts 6-1
Replacing the AMPS fuse 3-3
Resistance calibration 2-9, 2-16
Restoring factory defaults 1-4
Routine Maintenance 3-1
RS-232 interface 4-7
RTD temperature 1-13
S
Saving calibration constants 2-19
Setting calibration dates 2-12
Setting the line voltage and replacing the line
fuse 3-2
Short and open calibration 2-14
Signal switching 4-9
Software requirements C-2
Solder repairs 5-2
Specifications A-1
Static sensitive devices 5-3
Status byte EAV (Error Available) bit B-17
T
Test considerations 1-5
Test equipment connections 2-21
Test summary 1-5
Thermocouple temperature 1-12
Trigger circuits 4-8
Troubleshooting 4-1, 4-10
U
Unlocking manufacturing calibration 2-22
Using the *OPC command B-18
Using the *OPC? query B-17
V
Verification limits 1-4
Verification test requirements 1-2
Verifying AC current 1-9
Verifying AC voltage 1-7
Verifying DC current 1-8
Verifying DC voltage 1-6
Verifying frequency 1-14
Verifying ratio 1-14
Verifying resistance 1-10
Verifying temperature 1-12
W
Warm-up period 1-2, 2-2

Table of Contents

Other manuals for Keithley 2010

Related product manuals