EasyManua.ls Logo

Keysight Technologies E36100 Series - Setup for most Tests

Keysight Technologies E36100 Series
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup for most tests
This setup is used for most tests and it requires the DMM, electronic load, and power supply being
verified. Some wire is also required for connection between instruments. A LAN or USB cable is needed
for readback data. The DMM measures the power supply output, and the electronic load draws current
from the power supply. The accuracy of the current monitoring resistor must be 0.01% or better, which
should include any self-heating effects.

Table of Contents

Related product manuals