Getting Started Guide 35
Quick Start
Turning On the Test Platform the First Time
9. Select a scenario. In the HCCU, on the Scenarios tab,
select a testing scenario (such as
NR5GFormatOpt03_RF) and click the
Activate icon. Wait while the selection
is set up (an "in progress" message is
displayed while the scenario is being
activated).
10. Run the test
application.
Activate the test application by
double-clicking on the 5G NR Test App
icon on the desktop. (There is a lengthy
delay while the software loads.)
11. Run the HCCU. Activate the Keysight NES Hardware
Configuration Control Utility by
double-clicking the Keysight HCCU
icon on the desktop. (This utility runs
within a browser window.)
12. Wait for the
application to
load.
Later in the loading process, a
splash-screen is displayed (with a
progress indicator).
Step Action Notes

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight Technologies E7515B UXM 5G and is the answer not in the manual?

Keysight Technologies E7515B UXM 5G Specifications

General IconGeneral
BrandKeysight Technologies
ModelE7515B UXM 5G
CategoryTest Equipment
LanguageEnglish

Related product manuals