EasyManua.ls Logo

Keysight x-series - Use of the Test Port Adaptors on Instrument RF Input 2

Keysight x-series
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Keysight Connector Kit
Use of the Test Port Adaptors on Instrument RF Input 2
Use of the Test Port Adaptors on Instrument RF Input 2
Two, 1mm test port adaptors are supplied in the kit. The 1 mm female test port to
1 mm female adaptor is used as a connector saver to extend the lifespan of the
instrument RF Input 2 connector. The other test port adaptor is a 1mm female test
port to 1.85 mm female adaptor. This adaptor is also a connector saver.
USE CAUTION WHEN INSTALLING ADAPTORS! Rotation of the adaptor after the
connectors are engaged will damage the input connector on the instrument.
1.
Align the test port adaptor with the 1 mm RF Input 2 connector on the instrument
and engage the nut of the input connector with the adaptor. Fully engage the
threads, but do not attempt to fully torque the connection.
2. Locate the torque wrench in the kit. Locate a 14 mm open-end wrench.
3.
Place the jaws of the open end wrench onto the test port adaptor wrench flats,
but do not turn this wrench.
4.
Place the jaws of the 10-inch-pounds end of the torque wrench onto the
instrument RF Input 2 connector. While holding the test port adaptor still with
the open end wrench, torque the input connector to 10- inch-pounds.
Getting Started and Troubleshooting Guide 85

Table of Contents

Other manuals for Keysight x-series

Related product manuals