Electrical installation
Common control terminals
Important notes
6
l
203
EDS84ASC552 EN 8.1
Preparing the cable installation
The shields of the control cables are connected to the left shield lug of the front shield
sheet. For this, proceed as shown in the illustration.
1. Release the holding screw of the shield sheet.
2. Bring the shield sheet into one of the two possible lock−in positions.
3. Tighten the holding screw to lock the shield sheet.
8400GG018
Fig. 6−23 Locate shield sheet in position