EasyManua.ls Logo

Lenze 8400 HighLine C - Page 231

Lenze 8400 HighLine C
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Before switching on
7
l 231
EDS84ASC552 EN 8.1
7 Commissioning
) Note!
ƒ Please observe the general safety instructions ( 12).
ƒ Please observe the notes regarding residual hazards ( 18).
7.1 Before switching on
) Note!
ƒ Comply with the respective switch−on sequence.
ƒ In case of trouble during commissioning, the following supports you:
The "Diagnostics" chapter
The online help in the »Engineer«
The software manual of the prevailing device version
In order to avoid injury to persons or damage to material assets, check ...
... before switching on the mains voltage:
ƒ Check the wiring for completeness, short−circuit and earth fault
ƒ The "emergency switching off" function of the entire plant
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage
of the controller
ƒ The in−phase connection of the motor
ƒ The direction of rotation of the incremental encoder (if available)
...the setting of the most important drive parameters before controller enable to ensure
the following:
ƒ The V/f rated frequency is adapted to the motor circuit configuration!
ƒ The drive parameters relevant for your application are set correctly!
ƒ The configuration of the analog and digital inputs and outputs are adapted to the
wiring!
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com

Table of Contents

Related product manuals