INSTALLATION & SERVICE MANUAL – EASYLIFT – UK VERS 1.5
Liftup A/S Hagensvej 21| DK-9530 Støvring | Denmark | T: +45 96 86 30 20 | M: support@liftup.dk | www.liftup.dk | CVR DK-1015 3964
10.9 Pull force of mounting screws
Recommended strength of screw, attachment when installing Vertical Rail Guides
Screws, attachment to the building must withstand a Pull Force not less than 0.5 kN each.
(See next page examples of screw attachments)
!!! Minimum 3 screws in each Vertical Rail Guide !!!
NOTE: If the strength of screw, attachment is validated by test, minimum
withdrawal strength is 1.5 kN. Factor of Safety > 3