EasyManua.ls Logo

Linde H 80 D - Page 34

Linde H 80 D
282 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 26
Section 4.1
Service Training
09.06
SETTING OF INJECTORS
For a correction of the opening pressure:
- Remove injector from nozzle tester 8008. Remove
tensioning nut and uninstall all components. Use dolly
110 110 for the injector.
Sequence of parts disassembly and re-assembly
1. Tensioning nut
2. Nozzle
3. Adapter
4. Thrust pin
5. Compression spring
6. Shim
- Adjust opening pressure by selecting appropriate shim.
A thicker shim will increase the opening pressure. Re-
assemble injector. Tighten tensioning nut.
Specified tightening torque: 30 - 40 Nm
- Check injector on nozzle tester 8008 once again.

Table of Contents

Related product manuals