EasyManua.ls Logo

Lonza PyroTec PRO - Maintenance Table: Yearly Maintenance

Default Icon
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Return to TOC
PyroTec™ PRO Hardw are User’s Manual, V1.2 86
RT-MN024-1.2 02/21
Weekly
Maintenance
Instrument/Component
Maintenance Task
Reference
Liquid handling arm,
Robotic manipulator arm,
Clean front arm guide
See section “Arm Guide”
Air displacement
pipetting arm (Air LiHa)
Perform the following tests:
Pressure Leak Test
See PyroTec™ PRO Software
User Guide
The weekly maintenance should be performed on the last working day of each week.
9.2.4 Maintenance Table: Yearly Maintenance
Annual maintenance will be performed by a Lonza approved FAS (field application specialist)
and be offered through a service contract. Reference material for the maintenance tasks
can be available upon request.
Every Twelve
Months
Instrument/Component
Maintenance Task
Air displacement pipetting
arm (Air LiHa)
Perform liquid handling
performance verification test
(Colorimetric QC Kit test or Gravimetric test)
Complete PyroTec™ PRO
Clean system
Frontal arm guide
Clean
Worktable
Visually inspect worktable grids for wear and replace
if necessary.
LiHa
Visually inspect moving parts, especially Y-belt and lower DiTi eject
option, for wear and replace faulty parts.
Check parts for abrasion; wipe wear debris off, if necessary.
LiHa; support tubing
Check condition of mesh (must not be broken).
Check if support-tubing ends lock firmly in their seats.
Replace defective support tubing.
DiTi cone and tubing ex-
tension
Replace
Air LiHa; DiTi cone tip
adapter
Replace option DiTi cone Air LiHa
RoMa
Visually inspect moving parts, especially Y-belt, for wear and replace
faulty parts.
Check parts for abrasion; wipe wear debris off, if necessary.
RoMa; Z-rod
Clean
Complete PyroTec™ PRO
Perform tests according to form “Preventive Maintenance”

Table of Contents

Related product manuals