EasyManua.ls Logo

MacDon 5000 - Maintenance Schedule

MacDon 5000
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE/SERVICE
MAINTENANCE SCHEDULE The following maintenance schedule is a listing of periodic maintenance
pro
c
edures
, organi
ze
d
by
service intervals.
For
detailed instructions,
see
the
specific headings in
Mai
ntenance/Service section.
Use
"Recommended Fluids
and
Lubricants"
as
specified under that heading.
Service Intervals
The
recommended
service
i
nterval
s
are
in
hours
of
operation
.
IMPORTANT: Recommended
interva
ls
are
for
average
conditions.
Service
the
machine
more often
if
operated
unde
r
adverse
conditions (severe
dust,
extra
heavy
load
s,
etc
.).
Regular
ma
intenance is the best insurance against early wear and untimely breakdowns. Following
th
is
schedule will increase machine li
fe
.
Whe
re a service in
terval
is
given
in
more
than
one
li
me
fr
ame
, ego "100
hours
or
Annually", servi
ce
the machine at whichever interval is reached first.
A CAUTION: Car
ef
ully
follow
saf
ety messages given
under
"
Servic
e Pr
oc
edures",
AT FI
RS
T USE: See "Preparing the
Wi
ndrower" and "Break-In
Pe
riod" in Operation section,
10 HOURS OR
DAILY
1. Grease roll u
ni
versal shafts.
2.
Check hydraulic
0\
1 level.
3. Check hydraulic hoses and lines for leaks.
4.
Oil sickle (except
in
sandy conditions
).
25
HOURS
1. Grease sickle head,
50
HOURS
1, Grease tongue pivot and transport lock pin.
2.
Grease main drive shaft bearing.
3.
Grease reel shaft bea
ri
ngs.
4. Grease auger shaft bearings.
5. Grease roll shaft bearings.
100 HOURS OR
ANNUALLY'
5. Check si
ck
le sections, guards, & hold-downs.
6.
Oil reel d
ri
ve chain,
7. Oil
au
ger drive chain.
8.
Check tire pressure.
6.Grease frame-to-h
ea
der pi
vot
7.Grease lower
fl
oat link bushings.
8.Grease auger drive jackshaft bea
ri
ngs.
9.0 il center link ball joints.
10. Oil spri
ng
pivots.
11
. Check hitch pin lock
nut
to
rg
ue.
1.
Check roll drive chain tension.
4.
Check wobble b
ox
lubricant leve
l.
2. Check roll drive chain case lubricant level. 5. Check wheel bolt torques,
3.
Check wobble box mounting bolt torques. 6. Grease wheel hub bearings.
It is re
co
mmended that Annual Maintenance be done prior to start
of
operating season.
EN
D OF SEASON; See "Storage Proced
ur
e" in Operation sect
io
n.
250 HOURS
1.
Change hydraulic
oi
l
fi
lter.
600 HOURS
or
3 YEARS
1. Change
hydraulic oi
l.
1000 HOURS or 3 YEARS
1. Change wobble box lubricant.
61

Table of Contents

Related product manuals