Turning loads
7.3 Turning a load
7 - 4 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
7.3 Turning a load
When turning the load, proceed as is described in this section.
H
As soon as the load is attached to two hooks, there will be slight deviations
on the
Current load display. However, these deviations are still on the safe
side with regard to an SLI shutdown.
In principal, loads are turned with the auxiliary single-sheave boom top or
heavy load lattice extension in the same way as with the swing-away lattice
as illustrated in the following.
S
Risk of accidents due to overloading
Keep the acceleration forces to a minimum during two-hook operation.
For this reason, move the load at minimum speed.

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals