EasyManua.ls Logo

Mindray A8 - Page 122

Mindray A8
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre-operation Preparations Preoperative Tests
5 - 18 Operator’s Manual of Anesthesia System
9. Ensure that the breathing system is correctly connected and not damaged.
WARNING: Before connecting the equipment to the patient, flush the device with
O
2
at a flow of 8 L/min for at least two minutes. This removes unwanted
mixtures and by-products from the system.

Table of Contents

Other manuals for Mindray A8

Related product manuals