EasyManua.ls Logo

Mindray BC-3000 Plus - 4.2 Installation Requirements

Mindray BC-3000 Plus
325 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing Your Analyzer
4-2
4.2 Installation Requirements
Before installation, you should ensure that the following space, power and environmental
requirements are met.
4.2.1 Space Requirements
Check the site for proper space allocation. In addition to the space required for the analyzer
itself, arrange for
at least 28 cm on each side, which is the preferred access to perform service
procedures;
at least 10 cm behind for cabling and ventilation;
enough room on or below the countertop to accommodate the diluent, rinse and waste
containers.
4.2.2 Power Requirements
Check the availability of a power outlet that is
a female receptacle;
single phase with ground (confirmed third-wire earth ground);
100 VAC - 240 VAC;
50/60 Hz.
z Make sure the analyzer is properly grounded.
z If a power outlet with confirmed third-wire earth ground is not available, be
sure to connect the equipotentiality pole at the back of the analyzer to the
ground.
z Only install a 250V T4A fuse on the analyzer.
z Before turning on the analyzer, make sure the input voltage meets the above
requirements.
4.2.3 General Environment
Operating temperature: 15 - 35 ℃;
Optimal operating temperature: 15 - 30 ℃;

Table of Contents

Related product manuals