EasyManua.ls Logo

NEC Express5800 140Rd-4 - Preparing for Installation and Removal

NEC Express5800 140Rd-4
340 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-4
PREP
F
2. e (the POWER/SLEEP lamp goes off).
3. ).
4. m
5. a
or removing the
ARING FOR INSTALLATION AND REMOVAL
ollow the procedure below to prepare for installing or removing components.
1. Shut down the operating system.
Pr ss the POWER switch to power off the server
Unplug the power cord from the AC inlet on the server (the AC Standby lamps on the front of the server go off
Re ove all the cables connected to the server on the rear panel.
M ke the clearance of 1m to 2m in the front and rear sides and left and right sides of the server.
NOTE: Make sure to disconnect the power cord from the outlet before installing
option devices. If you remove the internal cable with the power cord being connected, the
STATUS lamp will light in amber when the server is powered. Disconnect the power cord, connect
it again, and then restart the server.

Table of Contents

Related product manuals