3-10
Insert the rails on the side faces of the server into the slide rail assemblies securely and then push the server slowly
and carefully. If the server is
locked on the way, push the server slowly with the depression of the release lever on
each of the left and right sides.
Slide rail assembly
Plastic portions
Bearing rail
Inner rail
Mating portion
Release lever
IMPORTANT: Push each release lever using a screwdriver or a similar tool. Pushing a release
lever with your fingers may cause the fingers to be caught and thus injured.
NOTE: The slide rail assembly installed in the rack contains a slide rail called the bearing rail.
The bearing rail can be moved freely in the slide rail assembly. To install the server in the rack
securely, slide the bearing rail to
the front of the rack to put the plastic components at the tip of the
rail and the inner rail into the server.
At the first installation, you may feel strong friction in pushing because the mechanical components cannot be
completely engaged with each other. Push the server intensely.
NOTE: While the server is pushed into the rack, the server may be locked and thus cannot be
pus pushed
into th to release the lock and then push the
server
hed any more. This is because the lock lever on the rail prohibits the server from being
e rack any more. Set the lock lever to be on the level
into the rack slowly.