CHAPTER 2 INSTALLATION
– 91 – NWA-008841-001 Rev.5.0
90ch2001.fm
Connection of BASE and BASE PLATE for Fixed Equipment
(1) Mount the BASE on the BASE PLATE by placing it over the hooks.
(2) Slide the BASE into the inner end.
(3) Secure the BASE to the BASE PLATE with two screws.
NOTE: Screws are attached to the BASE PLATE.
Connection of BASE and BASE PLATE
FRONT
BASE PLATE
BASE
HOOKS
BASE
BASE PLATE
SLIDE BASE INTO INNER END.