Wall Mounting Installation
• Check the site for installing the PBX with the work drawing to verify that the
required floor space is ensured and that service entrances and ducts for trunk/
extension cables, power cables and grounding conductors have been properly
worked at correct positions. See “Floor Space” and “Cable Hole Location”.
Page 84, Page 85
• Detach the front cover of each Module. See “Detaching FRONT
COVER”. Page 88
• Mark hole positions for installation of the PBX main equipment. See “Wall
Marking for HANGER ASSEM”. Page 101
• Secure the HANGER ASSEM to the wall.
• Hang the PIM to the HANGER ASSEM. See “Hanging PIM to HANGER AS-
SEM”. Page 102
NOTE: The BATTM cannot be installed on the wall.
• After hanging each PIM to the respective HANGER ASSEMs, connect PIMs
using screws. See “Connection of Modules”. Page 94
• Carefully review every step above to check that all necessary screws have been
properly placed and tightened.