CHAPTER 2 INSTALLATION
– 99 – NWA-008841-001 Rev.5.0
90ch2001.fm
Installation of MOUNTING BRACKET
Install the MOUNTING BRACKET to the top-stack PIM if the equipment is stacked with four or
more Modules.
(1) Remove four screws located on the rear side of the top-stack PIM.
(2) Secure the MOUNTING BRACKET to the PIM with the removed screws.
(3) Secure the PIM to the wall or ceiling by using wires, chains and eyebolts (locally provided).
Installation of MOUNTING BRACKET
SCREWS
FRONT
PIM
MOUNTING BRACKET
47 (1.8)
300 (11.
7
)
3
7
8
(
1
4
.
7
)
4
3
0
(
16
.
9
)
UNIT : mm (inch)