EasyManua.ls Logo

NEC NEAX 2000 IPS - Cable Running to External MDF

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 INSTALLATION
– 141 – NWA-008841-001 Rev.5.0
90ch2001.fm
Cable Running to External MDF
(1) When using the cable hole of the BASE, bring the MDF cable up to the Main Equipment through the
cable hole of the BASE.
(2) When using the cable hole of the PIM, make the cable hole on the right side of PIM. Then, bring the
MDF cable up to PIM0 through the cable hole of the BASE, and bring the MDF cable up to the other
PIM through the cable hole (right side) of each PIM.
Making Cable Hole on PIM
FRONT
CUT OFF THE PLATE.
FILE THE PROJECTIONS. PUT IN THE EDGINGS.
CABLE RUNNING TO MDF

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals