EasyManuals Logo

NEC NEAX 2000 IPS Installation Manual

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #303 background imageLoading...
Page #303 background image
– 287 – NWA-008841-001 Rev.5.0
90ch2002.fm
CHAPTER 2 INSTALLATION
MP System Changeover
Automatic Changeover
By detecting the emergency notice (EMA), the system executes the changeover from the MP0 to the
MP1 or from the MP1 to the MP0 automatically.
Manual Changeover
There are two ways for manual changeover as follows.
Case1 By MB Switch Setting:
Flip the MB switch on the MP0 card to ON (UP position).
- Now changeover is executed.
When you want the stand by MP card to return to the active MP, flip the MB switch on
the stand by MP card to OFF (DOWN position), then flip the MB switch on the active
MP card to ON (UP position).
Case2 By System Data Setting:
Assign the following data for changeover.
CME0 Y=6>3600: MM DD HH mm
MM: Month (01-12)
DD : Date (01-31)
HH : Hour (00-23)
mm : Minute (00-59)
NOTE: After setting the first data, the MAT indicates “INITIAL?_”.
Then input the present time. Now changeover is executed.
When there is no MP card for stand by, or the MB switch on the MP card in stand by is ON (UP
position), the MAT indicates “HARDWARE ERROR”.
BACKUP CPU SYSTEM

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC NEAX 2000 IPS and is the answer not in the manual?

NEC NEAX 2000 IPS Specifications

General IconGeneral
BrandNEC
ModelNEAX 2000 IPS
CategoryServer
LanguageEnglish

Related product manuals