EasyManua.ls Logo

NEC NEAX 2000 IPS - Operation Test

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 280 – NWA-008841-001 Rev.5.0
90ch2002.fm
CHAPTER 2 INSTALLATION
OPERATION TEST
Confirm the entered system data and hardware, including cable connection, by completing the following
operational tests.
Basic Connection Test at MDF
Station Line Test (Operator Call from all stations)
Central Office Trunk Test (Incoming, Outgoing)
Tie Line Trunk Test (Incoming, Outgoing)
Service Feature Test
Call Transfer
Step Call
Executive Right of Way (Executive Override)
Call Hold
Call Back
Call Forwarding-All Calls/Don’t Answer (No Answer)/Busy Line
Call Pickup
Station Hunting-Pilot/Circular
Speed Calling-Station/System (Station Speed Dialing/System Speed Dialing)
Paging Access (External Paging with Meet-me)
Announcement Service
Other selected features
NOTE: Feature names in the parenthesis are for North America.
OPERATION TEST

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals