EasyManua.ls Logo

NEC NEAX 2000 IPS - Stationary Equipment (for North America, Latin America, Australia); Fixed Equipment 1 (for North America, Latin America, Australia); Fixed Equipment 2 (for Asia, Africa, Europe, Middle East)

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 INSTALLATION
– 74 – NWA-008841-001 Rev.5.0
90ch2001.fm
Stationary Equipment (For North America, Latin America, Australia)
The equipment is placed on the BASE TRAY which is fixed on the floor, and is connected to 120 V/240 V
AC Power Source using AC CORD-D cable.
For installation of Stationary Equipment, see the following pages.
WIRING AC CABLE TO TERMINALS - Using AC CORD-D Page 76
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE TRAY Page 86
- Installation of Module, For Stationary
Equipment Page 83
Fixed Equipment 1 (For North America, Latin America, Australia)
The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to AC Power
Distribution Board using installation cable.
For installation of this equipment, see the following pages.
WIRING AC CABLE TO TERMINALS - Using Installation Cable Page 78
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE Page 86
- Installation of Module, For Fixed Equipment
Page 83
Fixed Equipment 2 (For Asia, Africa, Europe, Middle East)
The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to 120 V/240 V
AC Power Source using AC CORD-D cable.
For installation of this equipment, see the following pages.
WIRING AC CABLE TO TERMINALS - Using AC CORD-D Page 76
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE Page 86
- Installation of Module, For Fixed Equipment
Page 83
PROCEDURE

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals