CHAPTER 2 INSTALLATION
– 94 – NWA-008841-001 Rev.5.0
90ch2001.fm
Connection of Modules
NOTE: The FRONT STOPPER, BUILD PLATES, and screws are attached to the Module.
(1) Insert the BUILD PLATES (R)/(L) into the slits of the SIDE FRAME, then slide them backward
and lock them.
(2) Place the FRONT STOPPER on the Module, then fix it with three screws.
Connection of BUILD PLATE
Continued on next page
BUILD PLATE (L)
BUILD PLATE (R)
SIDE FRAME
INSTALLATION OF MAIN EQUIPMENT