EasyManua.ls Logo

NEC NEAX 2000 IPS - Page 113

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 INSTALLATION
– 97 – NWA-008841-001 Rev.5.0
90ch2001.fm
Installation of I/F BRACKET
Install the I/F BRACKET to the top-stack PIMs when the equipment is two frame stacks.
Secure the I/F BRACKET to rear side of top-stack PIMs with two screws from inside of PIMs.
NOTE: Screws are attached to the I/F BRACKET.
SCREW
FRONT SIDE
SCREW
I/F BRACKET
INSTALLATION OF MAIN EQUIPMENT

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals