CHAPTER 2 INSTALLATION
– 108 – NWA-008841-001 Rev.5.0
90ch2001.fm
Connection of 19RACK BRACKET (B)
(1) Place the BASE PLATE on the 19RACK BRACKET (B).
(2) Secure the BASE PLATE with four washer and nuts.
(3) Mount the BASE to the BASE PLATE.
(See “Connection of BASE and BASE PLATE”. Page 91)
(4) Mount the Module to the BASE.
(See “Connection of Module and BASE”. Page 92)
NOTE: Nuts and washers are attached to the 19
RACK BRACKET (B).
Connection of 19RACK BRACKET (B)
NUT
WASHER
19RACK BRACKET (B)
BASE PLATE