EasyManua.ls Logo

NEC NEAX 2000 IPS - Page 131

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 INSTALLATION
– 115 – NWA-008841-001 Rev.5.0
90ch2001.fm
STEP3: Connect the PWR CNT CA-E or PWR CNT CA-D, and POWER OUTPUT CABLE
(–48 V, E) as shown below.
Cable Connection between PZ-PW121/PZ-PW126/PZ-PW122 and BWB
NOTE: When the PN-4LLC card is used for OPS in North America, Ferrite Core must be attached
to the POWER OUTPUT CABLE (–48 V, E) between the PZ-PW122 card and the PWR0C
connector on BWB of the PIM, as shown below.
PWR CNT CA-E (FOR PIM0)
PWR CNT CA-D (FOR PIM1 TO PIM7)
PWR0B
PWR1
PZ-PW121
/PZ-PW126
BWB (BACK WIRING BOARD)
PIM
PWR0C
PWR0A
POWER OUTPUT CABLE (+90 V, CR, E)
PZ-PW122
POWER OUTPUT CABLE (+5 V, -27 V, E)
POWER OUTPUT CABLE (-48 V, E)
CARD SLOT AREA
LTC CONNECTOR AREA
CN103
NOTE
PWR0C
FERRITE CORE
PZ-PW122
GRAY
RED
YELLOW
POWER CABLE CONNECTION

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals