(4) When the system is two-frame configuration, the Installation cable of the right side frame can go
through the BASE of the left side frame.
Installation Cable Wiring for Two-Frame Configuration when AC120 V/ 240 V Power Supply System
BASE
FG
LINE
NEUTRAL
FG
LINE
NEUTRAL
TERMINAL
BLOCKS
TO
A
C POWER
DISTRIBUTION
BOARD
INSTALLATION CABLE
CORD BUSH
WIRING POWER CABLE TO TERMINALS