EasyManua.ls Logo

NEC NEAX 2000 IPS - Page 99

NEC NEAX 2000 IPS
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 INSTALLATION
– 83 – NWA-008841-001 Rev.5.0
90ch2001.fm
For Fixed Equipment
(1) Fix the BASE PLATE to the floor with anchor bolts.
(2) Fix the BASE to the BASE PLATE with screws. See “Connection of BASE
and BASE PLATE”. Page 91
(3) Fix the Module onto the BASE with screws. See “Connection of Module
and BASE”. Page 92
For Stationary Equipment
(1) Fix the BASE TRAY to the floor with anchor bolts.
(2) Fix the Module onto the BASE with screws. See “Connection of Module
and BASE”. Page 92
(3) Place the Module and the BASE on the BASE TRAY. See “Placing Module
on BASE TRAY”. Page 93
Connect Modules with screws. See “Connection of Modules”.
Page 94
Install the I/F BRACKET to the top-stack PIMs if the equipment is stacked with
five or more Modules. See “Installation of I/F BRACKET”. Page 97
Install the TOP COVER to the top-stack PIM. See “Installation of TOP COV-
ER”. Page 98
Install the MOUNTING BRACKET to the top-stack PIM if the equipment is
stacked with four or more Modules. See “Installation of MOUNTING
BRACKET”. Page 99
Carefully review every step above to check that all necessary screws have been
properly placed and tightened.
Installation of
Checking
End
A
Installation of Module
Multiple-Module
Installation of
Top Cover
Installation of
Mounting Bracket
INSTALLATION OF MAIN EQUIPMENT

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals