EasyManua.ls Logo

NEC SL2100 - Chapter 2. Installation; Section 1 INSTALLING THE MAIN & EXPANSION CHASSIS; 1.1 Before Installing the Chassis; 1.1.1 General Precautions

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
INSTALLING THE MAIN & EXPANSION CHASSIS 37
Chapter 2. Installation
Section 1 INSTALLING THE MAIN & EXPANSION CHASSIS
1.1 Before Installing the Chassis
Please read following precautions carefully before installation.
1.1.1 General Precautions
To avoid shock or equipment damage, do not plug in or turn the system power on before completing the
installation process.
Avoid working with the Equipment during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied with the Chassis.
Install batteries with the correct polarity to prevent damaging equipment.
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone line is disconnected at the network
interface.
To avoid damage, the Chassis should not be placed on unstable surfaces.
To avoid damage the Plastic parts, never use an Electric Screw Driver to tighten the screws.
To prevent overheating, do not bundle AC power cords together.
Make sure the Chassis has proper Earth ground.
If Expansion Chassis are installed, turn the power on/off in the following order: Expansion 2 Chassis, Expansion 1
Chassis and then Main Chassis
Not all boards are hot swappable. Do not remove or install from the chassis
when powering up.
1.1.2 Preparations
The following tools will be required when installing hardware into an SL2100.
- Screw driver set
- Side cutters to cut out knockouts
- Pliers for removing daughter board stand offs
- Screw driver socket 5 mm for EXIFB-C1 board
Make sure you have a building plan showing common equipment, extensions, the telecom demarcation, and earth
ground location. The installation site must meet the following site / environmental requirements.

Table of Contents

Other manuals for NEC SL2100

Related product manuals