EasyManua.ls Logo

NEC SL2100 - SECTION 9 IN-MAIL (VOICE MAIL SYSTEM ADMINISTRATOR); Log-In to In-Mail

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
INSTALLING THE MAIN & EXPANSION CHASSIS 57
110VAC
120VAC
220VAC
230VAC
240VAC
Ground Requirement
No.14 AWG Copper Wire
Feeding Voltage
SLT: 20 mA/ -27 V
AC Input I
Main Chassis =
1.43 A
3 Chassis Total
= 4.29 A
Main Chassis =
1.25 A
3 Chassis Total
= 3.75 A
Main Chassis =
0.82 A
3 Chassis Total
= 2.46 A
Main Chassis =
0.79 A
3 Chassis Total
= 2.37 A
Main Chassis =
0.76 A
3 Chassis Total
= 2.28 A
KWh
Main Chassis =
0.143 KWh
3 Chassis Total
=0.429 KWh
Main Chassis =
0.150 KWh
3 Chassis Total
=0.450 KWh
Main Chassis =
0.185 KWh
3 Chassis Total
=0.541 KWh
Main Chassis =
0.182 KWh
3 Chassis Total
=0.545 KWh
Main Chassis =
0.182 KWh
3 Chassis Total
=0.547 KWh
BTU (KWh x 3413)
Main Chassis =
488 BTU
3 Chassis Total
=1464 BTU
Main Chassis =
512 BTU
3 Chassis Total
=1536 BTU
Main Chassis =
631 BTU
3 Chassis Total
=1894 BTU
Main Chassis =
621 BTU
3 Chassis Total
=1863 BTU
Main Chassis =
621 BTU
3 Chassis Total
=1863 BTU
1.8.3 AC Power Cord
The AC power switch and AC power inlet are located at the back side of each Chassis. The AC power
cord is connected to the AC inlet and the commercial AC power socket.
Before connecting the AC power cord, make sure:
The power switch at the back side of each Chassis is turned OFF.
The power switch at the commercial AC power socket is turned OFF.
The AC plug fits the commercial AC power socket. The plug adapter is necessary if it
does not fit.
To prevent damage, do not use a hammer to connect the AC power cord to AC power
jack on the chassis, it must be connected by hand.
To Commercial
AC Power Socket
Figure 2-26 AC Power Cord
Connect
Chassis
AC Power Cord

Table of Contents

Other manuals for NEC SL2100

Related product manuals