EasyManua.ls Logo

Neuson 6001 - Page 110

Neuson 6001
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-36 BA 6001/9001/10001 En – Edition 2.0 * * 6001b540.fm
Maintenance
Check exhaust system for damage and condition
● ●
Check valve tip clearance. Adjust if necessary
●
Fuel injection pump
●
Injection and pressure
●
Check injection nozzles and valves
6
●
Empty diesel fuel tank
●
Check battery electrolyte. Fill up with distilled water if necessary
● ● ●
Tyre check (damage, air pressure, tread depth)
● ●
Wheel nuts
● ●
Check alternator, starter and electric connections, bearing play and function
●
Preheating system, electric connections
●
Pressure check of primary pressure limiting valves
7
● ●
Check piston rods for damage
● ●
Check screws for tightness
● ●
Pin lock
● ●
Line fixtures
● ●
Check telltales for correct function
● ●
Insulating mats in engine compartment
● ●
Cleanliness of access
● ●
Adhesive labels and Operator's Manual
● ●
Engine cover gas strut
● ●
Lubrication service ( ):
Lubricate the following assemblies/components – see Lubrication plan on page 5-38:
5.15 Maintenance plan (overview)
Work description
For service and maintenance work on the attachment, please refer to the operation and maintenance manual of the attachment
manufacturer as well.
Maintenance plan/service hours (s/h)
Maintenance work
(once a day)
Every 50 s/h
Every 500 s/h
Once a year or after 1000 s/h
After 1500 s/h
Customer

Table of Contents