Access Route
Considerations
Yes No N/A Comment
Can the access
route support the
weight of the
unpacked rack?
Is the access
route onto the
raised floor rated
for dynamic
loading of the
rack?
Related Topics:
• Table: Access Route Requirements. (page 1-33)
• Table: Rack Weights for Oracle Exadata Database Machine (page 1-29)
• Table: Rack Weights for Oracle Exadata Storage Expansion Rack (page 1-31)
• Flooring Requirements (page 1-34)
A.5 Facility Power Checklist
Use this checklist to ensure that the facility power requirements have been addressed.
Facility Power
Considerations
Yes No N/A Comment
Have the
operating voltage
and electric
current
requirements
listed in
"Electrical Power
Requirements
(page 1-34)"
been reviewed?
Will single-phase
(low-voltage or
high-voltage) or
3-phase (low-
voltage or high-
voltage) power
be used?
Are enough
power outlets
provided within 2
meters for each
rack?
Appendix A
Facility Power Checklist
A-9